Project detail

  1. Project detail
image description


  • Duration: 2015-03-01 to 2015-06-01
  • Employer: Pakhtunkhwa Highways Authority
  • Location: Khyber Pakhtunkhwa



Bridge at Tor Warsak Daggar

Tore Warsak road in District Buner traverses across an Irish Crossing which usually get overflowed in high intensity rainfalls and monsoon seasons. There was a need for construction of bridge over the torrential nullah to avoid disruption of traffic all the year round. A two-span bridge has been designed to replace the existing old Irish Crossing.





Project gallery