Project detail

  1. Project detail
image description


  • Duration: 2019-09-01 to 2021-09-30
  • Employer: Pakhtunkhwa Highways Authority
  • Location: Khyber Pakhtunkhwa



Elai Bridge

This bridge is located on Sowari Mingora road and connects Sowari with Torwarsak. The Old existing bridge has a significant settlement of up to 8” which may cause any form of a collateral damage. Moreover, the capacity of existing bridge was of only one active lane. The Proposed Elai kalay project includes dismantling of the old bridge and construction of new bridge with 02 lanes.




Project gallery