- Duration: 2019-12-16 to 2020-01-30
- Employer: Pakhtunkhwa Highways Authority
- Location: Khyber Pakhtunkhwa
Khar Mohmand Gat Road
The project is the only major road in Bajur Agency and connects Mohmand agency and Bajur Agency with urban KPK. Total length of project road is 31 km and it includes Nawagai By Pass as well with carriageway width of 7.3 m, mostly flexible pavement while rigid pavement in Gradient/Urban areas. Shoulder is 2m treated on either side. This road is designed speed of 80 kmph and includes 50 culverts & 01 Bridge as well. Retaining /erosion control and drainage was converted from non-existent status to Intensive.
