  • Duration: 2019-12-16 to 2020-01-30
  • Employer: Pakhtunkhwa Highways Authority
  • Location: Khyber Pakhtunkhwa



Khar to Timergara and Toor Ghundi – Khar Road

The project starts from Khar (District Bajaur) and ends at Timergara bypass (District Lower Dir), both the districts are equally benefited from the project road especially the areas like Toor Ghundi, Munda, Gosam and Timergara city. Total length of project road is 37.84 km, with carriageway width of 7.3 m, mostly flexible pavement while rigid pavement in Gradient/Urban areas. Shoulder is 2m treated on either side. This road is designed speed of 80 kmph and includes 107 culverts as well. Retaining /erosion control and drainage was converted from non-existent status to Intensive.