- Duration: 2015-10-01 to 2015-12-01
- Employer: Pakhtunkhwa Highways Authority
- Location: Khyber Pakhtunkhwa
Nathiagali to Thandiani Road
The project included improvement Galyat in district Abbottabad. The approach to Thandiani is from Abbottabad, but it can also be reached from Murree-Nathiagali route. Thandiani is 31 KM from Abbottabad and 25 KM from the Thandiani-Nathiagali crossing. The drive from Abbottabad takes more or less 90 minutes, with lovely views on both sides of the road. The road is metalised all the way. Thandiani is an undeveloped tourist spot.
