Project detail

  1. Project detail
image description


  • Duration: 2019-09-01 to 2021-09-30
  • Employer: Pakhtunkhwa Highways Authority
  • Location: Khyber Pakhtunkhwa



RCC Bridge on Haripur – Beer Section

Haripur Beer bridge is located on DOR river on road connecting Beer with Haripur. The existing bridge is Pre-stressed I Girder Bridge and proposed new bridge will also be same. Recently one span of this bridge collapsed due to scouring and consequently tilting of pier. The Bridge length is 150m.




Project gallery