Project detail

  1. Project detail
image description


  • Duration: 2011-09-01 to 2014-10-01
  • Employer: Pakhtunkhwa Highway Authority
  • Location: Khyber Pakhtunkhwa



Rupper Bridge

The road provides main access for communities settled along the right bank and left bank of River Swat. The project is aimed at improvement of existing infrastructure for uplift of the region in general.





Project gallery