← All projects

MOTORWAYS AND HIGHWAYS · Design / 2026 – Ongoing

Consultancy Services for Feasibility Study & Detailed Engineering Design, Improvements, Conditional Survey & Detailed Mapping Abbottabad-Nathiagali-Barrian Road (57.5km) & Kozagali - Ayubia-Khanspur Road (6.15km)

Consultancy Services for Feasibility Study & Detailed Engineering Design, Improvements, Conditional Survey & Detailed Mapping Abbottabad-Nathiagali-Barrian Road (57.5km) & Kozagali - Ayubia-Khanspur Road (6.15km) – image 1
Consultancy Services for Feasibility Study & Detailed Engineering Design, Improvements, Conditional Survey & Detailed Mapping Abbottabad-Nathiagali-Barrian Road (57.5km) & Kozagali - Ayubia-Khanspur Road (6.15km) – image 2
Consultancy Services for Feasibility Study & Detailed Engineering Design, Improvements, Conditional Survey & Detailed Mapping Abbottabad-Nathiagali-Barrian Road (57.5km) & Kozagali - Ayubia-Khanspur Road (6.15km) – image 3
Consultancy Services for Feasibility Study & Detailed Engineering Design, Improvements, Conditional Survey & Detailed Mapping Abbottabad-Nathiagali-Barrian Road (57.5km) & Kozagali - Ayubia-Khanspur Road (6.15km) – image 4
Consultancy Services for Feasibility Study & Detailed Engineering Design, Improvements, Conditional Survey & Detailed Mapping Abbottabad-Nathiagali-Barrian Road (57.5km) & Kozagali - Ayubia-Khanspur Road (6.15km) – image 5
1 / 5

THE PROJECT

Pakistan is progressively developing to enhance its current road density in view of regional trade for sustainable economic growth. This also includes development of internal trade routes to facilitate population centers along the fringes to explore tourism, mines and minerals. Pakistan is blessed with immense reserves of minerals and natural resources. This aspect is dependent on efficient transport network. The Pakhtunkhwa Highways Authority (PKHA) aims to promote tourism in Khyber Pakhtunkhwa by improving accessibility, enhancing regional connectivity, reducing traffic congestion, and providing efficient links to the national highway and motorway network The Pakhtunkhwa Highways Authority (PKHA) is committed to enhancing regional connectivity and transportation infrastructure. In line with this commitment, the consultancy services for Feasibility Study & Detailed Design have been awarded to M/s Pavron for “"FEASIBILITY STUDY, DETAILED ENGINEERING DESIGN, IMPROVEMENTS, CONDITIONAL SURVEY & DETAILED MAPPING ABBOTTABAD - NATHIAGALI - BARRIAN ROAD 57.50KM & KOZAGALI - AYUBIA - KHANSPUR ROAD 6. 15KM. The road has a total length of approximately 57.5 km with a carriageway width of 8.1 m. The project was undertaken by the National Highway Authority (NHA) with National Engineering Services Pakistan (NESPAK) Pvt. Ltd. serving as the consultant. Construction works were executed under the supervision of the Frontier Works Organization (FWO), specifically the 13 Engineer Battalion (Siachin Sappers). The project commenced in April 1993 and was completed in November 1999, representing a major infrastructure investment aimed at improving connectivity between the Galiyat hill stations and Abbottabad.

GOOD PROJECTS BEGIN WITH A CONVERSATION

Let’s build
what’s next.

Your ambition. Our engineering perspective.

ISLAMABAD, PAKISTAN / EST. 2004