MOTORWAYS AND HIGHWAYS · Design / 2021 – 2022

Feasibility Study And Detailed Engineering Design of PKHA Works: “ADP Scheme No. 1849/210777 Rehabilitation and Improvement of Thall Parachinar Road District Kurram”

Feasibility Study And Detailed Engineering Design of PKHA Works: “ADP Scheme No. 1849/210777 Rehabilitation and Improvement of Thall Parachinar Road District Kurram” – image 1
Feasibility Study And Detailed Engineering Design of PKHA Works: “ADP Scheme No. 1849/210777 Rehabilitation and Improvement of Thall Parachinar Road District Kurram” – image 2
Feasibility Study And Detailed Engineering Design of PKHA Works: “ADP Scheme No. 1849/210777 Rehabilitation and Improvement of Thall Parachinar Road District Kurram” – image 3
Feasibility Study And Detailed Engineering Design of PKHA Works: “ADP Scheme No. 1849/210777 Rehabilitation and Improvement of Thall Parachinar Road District Kurram” – image 4
1 / 4

THE PROJECT

The proposed road project is a key trade corridor linking Pakistan to Afghanistan, starting from Thall and ending at Parachinar over a length of 82 km. The existing single carriageway with limited ROW will be upgraded to a 7.3 m wide carriageway with 2 m treated shoulders on both sides. Flexible pavement will be used throughout the route, with rigid pavement in gradient and urban areas for durability. The road is designed for a speed of 80 km/h and includes 338 culverts and 29 bridges to ensure proper drainage and connectivity. This project aims to improve trade, regional connectivity, and traffic safety.