WATER RESOURCES · Water Resources Engineering / 2021 – Ongoing
Ghalanai Water Supply System (GWSS)
THE PROJECT
The Services were awarded to M/s Pavron by 45 Engrs Div TDP secteriate. This include the Services for Fesibility Study, Detail Design & Construction Supervision It also included Identify licensing, permitting and other legal risks Risk Allocation and Financing. The present population of Ghallani is 24,020 persons. After completion of the project, a projected population of over 42,460 (2040) persons will be provided with proper water supply facilities. To utilize the available water sources in Srokally, water is to be pumped to project area through mechanical pumping against high head till gravity Tank from where water will flow under gravity till existing water tanks in Ghalanai.