TUNNELS · Design / 2024
Feasibility Study & Detailed Design For Construction Of Link Roads (16) & Tunnel (2.7 Km) Joining Khaki With Oghi
1 / 5
THE PROJECT
The project actual services include conducting geotechnical, topographic, traffic, and hydrology surveys, followed by the preparation of pavement and structural design reports. It also covers tunnel feasibility and detailed tunnel design, along with financial, commercial, and environmental studies such as PC-I preparation, feasibility assessments, and the EIA report. Additionally, a road safety audit will be performed, and all final design documents will be compiled and submitted to client.
GOOD PROJECTS BEGIN WITH A CONVERSATION
Let’s build
what’s next.
Your ambition. Our engineering perspective.
ISLAMABAD, PAKISTAN / EST. 2004




