← All projects

TUNNELS · Design / 2024

Feasibility Study & Detailed Design For Construction Of Link Roads (16) & Tunnel (2.7 Km) Joining Khaki With Oghi

Feasibility Study & Detailed Design For Construction Of Link Roads (16) & Tunnel (2.7 Km) Joining Khaki With Oghi – image 1
Feasibility Study & Detailed Design For Construction Of Link Roads (16) & Tunnel (2.7 Km) Joining Khaki With Oghi – image 2
Feasibility Study & Detailed Design For Construction Of Link Roads (16) & Tunnel (2.7 Km) Joining Khaki With Oghi – image 3
Feasibility Study & Detailed Design For Construction Of Link Roads (16) & Tunnel (2.7 Km) Joining Khaki With Oghi – image 4
Feasibility Study & Detailed Design For Construction Of Link Roads (16) & Tunnel (2.7 Km) Joining Khaki With Oghi – image 5
1 / 5

THE PROJECT

The project actual services include conducting geotechnical, topographic, traffic, and hydrology surveys, followed by the preparation of pavement and structural design reports. It also covers tunnel feasibility and detailed tunnel design, along with financial, commercial, and environmental studies such as PC-I preparation, feasibility assessments, and the EIA report. Additionally, a road safety audit will be performed, and all final design documents will be compiled and submitted to client.

GOOD PROJECTS BEGIN WITH A CONVERSATION

Let’s build
what’s next.

Your ambition. Our engineering perspective.

ISLAMABAD, PAKISTAN / EST. 2004