← All projects

MOTORWAYS AND HIGHWAYS · Design / 2019

Feasibility Study and Detailed Engineering Design for Construction of Swat Motorway from Chakdara to Fatehpur (Phase-II) 79.69Km

Feasibility Study and Detailed Engineering Design for Construction of Swat Motorway from Chakdara to Fatehpur (Phase-II) 79.69Km – image 1
Feasibility Study and Detailed Engineering Design for Construction of Swat Motorway from Chakdara to Fatehpur (Phase-II) 79.69Km – image 2
Feasibility Study and Detailed Engineering Design for Construction of Swat Motorway from Chakdara to Fatehpur (Phase-II) 79.69Km – image 3
Feasibility Study and Detailed Engineering Design for Construction of Swat Motorway from Chakdara to Fatehpur (Phase-II) 79.69Km – image 4
1 / 4

THE PROJECT

Phase II of the Swat Motorway is planned from Mingora (in vicinity of Ayub Bridge linking Mingora to Kanju) to Bagh Dheri - Chikrai. Motorway alignment from Chakdara to Mingora (Phase II) initially staked out previously is also being reviewed by M/s Pavron. Total length of the project is approximately 42Km with additional 10Km of link highways connecting S3 and N95 with at all interchanges. A total of Nine (09) interchanges have been planned providing access to Barikot, Shamozai, Kanjo, Mingora, Malam Jaba, Sher Palam areas of Swat district. The motorway is provided with four (04) main bridges crisscrossing River Swat at various location which will provide easy entry/exit facility for local community in addition to the tourists. Phase II and Phase III projects were combined into a single project named as Swat Motorway Phase II starting from Chakdara to Fatehpur. The total length of the project is now appox; 80KM.

GOOD PROJECTS BEGIN WITH A CONVERSATION

Let’s build
what’s next.

Your ambition. Our engineering perspective.

ISLAMABAD, PAKISTAN / EST. 2004